The best project management software for architects depends on one question: do you need the tool to track fees by phase, or only the work? Monograph and BQE CORE are the two purpose-built options, and they earn their higher price when you invoice by phase and want planned, logged and billed amounts on the same timeline. If your fees live in accounting software already and what you need is a clear picture of schematic design, design development, construction documents and construction administration across several projects, a general tool such as Breeze, Asana or Trello does the job at a fraction of the cost.

This comparison is written for principals and project architects at small and mid-size studios, roughly two to forty people, who juggle phases, consultants, client approvals and deadlines on a handful of projects at once. It is not for large AEC firms that need ERP-grade project accounting, multi-office resource planning and integrated payroll. Those firms are usually looking at Deltek Ajera or Deltek Vantagepoint, both quote-based, and the tools below will feel too light.

Disclosure: Breeze publishes this comparison and is one of the tools listed below. We do not do fee-by-phase accounting, RFI logs or drawing management, and we say so in the Breeze entry. Where a dedicated architecture tool is the better answer, we point you there.

How we chose these tools

We started from what a studio actually has to manage between winning a commission and closing out construction, then scored each tool on:

  • Phase structure: can a project be split into SD, DD, CD and CA with dates and owners, without fighting the tool.
  • Time and fees: does it log hours against phases, and can it compare that to the fee for the phase.
  • Consultant and client access: can a structural engineer or a client see and comment on what concerns them without a full paid seat.
  • Honest pricing: the published price, checked on the vendor's own pages in September 2026, and any seat minimums that change the real cost for a small studio.
  • What reviewers say: the recurring themes in Capterra and G2 reviews, summarised rather than cherry-picked.

Quick answer: best project management software for architects in 2026

  • Best for fee-by-phase tracking: Monograph
  • Best all-in-one for firm operations: BQE CORE
  • Best simple phase boards with time tracking: Breeze
  • Best for consultant coordination and dependencies: Asana
  • Best for dashboards and client-facing status: monday.com
  • Best for studios that plan in spreadsheets: Smartsheet

Pick Monograph or BQE CORE when the money side of a project is the problem you are trying to fix. Pick Breeze, Trello or Asana when the problem is that nobody can see what is due on which project this week. Pick Smartsheet or Wrike when a project manager will own the setup and the firm is large enough to justify the configuration.

Tool Best for Starting price (checked September 2026)
Monograph fee-by-phase planning and invoicing for architecture firms $45 to $490 per month billed annually, exact plan cost after a demo
BQE CORE time, billing, accounting and CRM in one system quote-based, modular
Breeze simple phase boards, time tracking and client access $9 per user per month, all features
Asana consultant coordination with dependencies free for 2 users, then $10.99 per user per month annually
monday.com dashboards and status reporting free for 2 seats, then $9 per seat per month annually, 3-seat minimum
ClickUp one configurable workspace for everything free plan, then $7 per user per month annually
Smartsheet spreadsheet-style schedules and fee tables $9 per member per month annually, no free plan
Wrike larger studios with a dedicated project manager free plan, then $10 per user per month annually
Trello one board per project, minimal setup free for 10 boards, then $5 per user per month annually
Notion project notes, meeting minutes and light task tracking free plan, then $10 per member per month

Why architecture projects break generic project management tools

An architecture project is a sequence of phases, each with its own fee, its own deliverable and its own approval gate, and a generic task tool knows nothing about that. It will happily let you make a list called "Design development", but it cannot tell you that DD is 60 percent through its fee with 40 percent of the drawings done, which is the number a principal actually wants on a Friday afternoon.

The second problem is the number of people who are not on your payroll. A modest commercial job involves a structural engineer, an MEP consultant, a landscape architect, a contractor and a client, and each of them owes you something on a date. Tools that charge a full seat for every one of those people get expensive fast, and tools that let them in for free often give them either too much access or too little.

The third problem shows up in construction administration. RFIs, submittals and change orders arrive in volume, and each one has a clock on it. A task with a due date and an attachment handles a dozen of them. It does not handle two hundred. None of the tools in this list is a construction administration platform, and it is better to know that up front than to discover it during CA on your biggest project.

List of project management software for architects

Here are the ten tools, starting with the two built specifically for architecture firms and moving to general tools that studios use for phases, deadlines and consultant coordination:

Monograph

Monograph phase timeline showing SD, DD, CD and CA phases with planned, logged and invoiced fees

  • Pricing: Monograph does not publish a flat per-seat price. Its pricing page shows a range of $45 to $490 per month billed annually, with annual plans paid up front and the exact plan cost shown after a demo. The Pipeline module is a separate add-on. Checked September 2026.
  • Rating: 4.5/5 on Capterra from 236 reviews, 4.3/5 on G2.

Monograph is the tool most small and mid-size architecture firms mean when they say they want software built for them. A project is a set of phases with a fee each, either fixed or hourly, and the timeline shows planned, logged, invoiced and paid amounts against every phase. Timesheets feed the same numbers, so when a project architect logs eight hours to CD, the CD fee bar moves. That single view replaces the fee spreadsheet most studios keep by hand and is the reason firms pay the premium.

Where Monograph fits

  • Fee by phase: Plan fees per phase, track burn against them and invoice from the same record.
  • Timesheets that mean something: Hours land on phases, so utilisation and remaining fee are always current.
  • Staffing view: See who is planned on which phase in which week across all live projects.
  • Accounting sync: QuickBooks integration keeps invoices out of double entry.
  • Familiar vocabulary: Phases, milestones and fees are named the way architects name them, so onboarding is short.

Where Monograph isn't the right fit: Studios that bill mostly hourly and need task tracking more than fee tracking, interiors or design-build work that invoices cost of goods, and firms that want a free trial before committing to an annual plan.

What users say about Monograph

Reviewers on Capterra and G2 consistently say Monograph was built by people who understand how an architecture firm structures phases, time and billing, and they praise the clean interface and the real-time view of budget against hours. The recurring complaints are about invoicing glitches that affect basic operations, slow loading, support response times that some reviewers feel have lengthened, a thin mobile app and reporting that is harder to customise than they would like. Several note that it is rigid for work that does not follow a traditional phase structure.

Sources: Capterra, G2

BQE CORE

BQE CORE dashboard showing project status with contract, billed, spent and work-in-progress figures, monthly allocation and to-dos

  • Pricing: Quote-based. BQE prices per user and sells CORE as a Foundations base module plus optional Accounting, CRM, HR and Payroll modules, so the cost depends on which you add. No published per-user rate. Checked September 2026.
  • Rating: 4.5/5 on Capterra from 792 reviews.

BQE CORE is the option for a firm that wants project management, time and expense tracking, billing and accounting in one system rather than a planning tool plus QuickBooks. It is broader than Monograph, and that breadth is both the point and the cost. The project planner lets you allocate people to activities inside a phase by week and see hours or dollars, and the billing side supports the various contract types, fixed fee, hourly with a cap, percentage of construction cost, that architects actually sign.

Where BQE CORE fits

  • One system for operations: Time, expenses, invoicing, accounting and CRM under one login.
  • Contract flexibility: Invoice templates for the range of fee structures architecture firms use.
  • Resource planning: Allocate staff to phases and activities by week in hours or amount.
  • Reporting depth: Project performance and profitability reports that principals use for firm-level decisions.
  • Integrations: QuickBooks, Xero and Microsoft 365 for firms that keep part of the stack elsewhere.

Where BQE CORE isn't the right fit: Studios under ten people who would use a fraction of the modules, and any firm that needs to be running in a week rather than after a setup and training period.

What users say about BQE CORE

Capterra reviewers describe BQE CORE as an all-in-one system with intuitive navigation once learned, flexible time and expense capture across many projects, and a wide set of reports and invoice templates. The most common criticisms are performance: frequent lag, slow loading at peak times and occasional glitches that interrupt work. Reviewers also warn that initial setup is a real project in itself, especially for report and billing customisation, and that it takes months rather than days to get fully comfortable, though they rate the support staff as patient and knowledgeable.

Source: Capterra

Breeze

Breeze project board with task lists used as project phases

  • Pricing: $9 per user per month billed yearly, or $10 billed monthly, with every feature included. A single-user Solo plan is $14 per month. Client users are free and unlimited. 14-day free trial.
  • Rating: 4.4/5 on Capterra from 45 reviews.

Breeze is the simple option in this list, and it is worth being precise about what that means for an architecture studio. A project is a board, and the columns are task lists you name yourself, so most studios set them up as phases: pre-design, SD, DD, CD, CA, closeout. Each task carries an owner, a due date, an estimate and logged time, and the timer or a manual entry marks hours billable or not. Project budgets are set in hours and a rate, and reports show hours per project, per person and per period, exportable to CSV or sent to FreshBooks for invoicing. Any project can be reused as a template, so the phase structure is built once.

Consultants and clients come in as client users at no charge. They can comment, upload files and, if you allow it, move tasks, but they only see the projects they are invited to and never see hidden tasks or internal comments. For clients who will not log in to anything, a report can be shared as a public link that shows progress without an account. The calendar has a project timeline that shows every project and dated task on one month or three-month view, and full Gantt charts are available through the companion app Ganttile, which syncs with the same projects.

Where Breeze fits

  • Phases as lists: Set up SD through CA once, save the project as a template, and every new commission starts with the same structure.
  • Time against tasks: Timer or manual entry, billable flag, estimates, and budget in hours and rate per project.
  • Free client and consultant seats: Bring in the engineer and the client without paying for them.
  • Fast adoption: Most studios are running in an afternoon. There is no admin role to staff.
  • Reports without setup: Hours, done work and what is due next by project, person or date range, with CSV export and public links.

Where Breeze isn't the right fit: Breeze has no fee-by-phase accounting. It knows hours and a rate per project, not a fixed fee per phase with planned versus invoiced amounts, so a studio that invoices by phase will still keep that in Monograph, BQE or a spreadsheet. It has no RFI or submittal log and no drawing or revision management. Resource forecasting is limited to estimates on tasks. If those are your main problems, look at Monograph or BQE CORE first.

Breeze task window with time tracking, estimate and comments

What users say about Breeze

Capterra reviewers describe Breeze as clean and quick to learn, with minimal onboarding, and single out the reminders and due-date emails as the thing that keeps busy teams on track. The main asks are for deeper reporting and more customisable project overviews, reusable checklist templates, and more integrations. One reviewer felt it looks plain next to more visual tools. The picture that emerges is a tool that does the basics well and stops there, which is either its strength or its limit depending on what you need.

Source: Capterra

Asana

Asana project timeline view for architecture phases

  • Pricing: Personal is free for up to 2 users. Starter is $10.99 per user per month billed annually or $13.49 monthly. Advanced is $24.99 annually or $30.49 monthly. Enterprise is quote-based. Checked September 2026 on Asana's pricing page.
  • Rating: 4.5/5 on Capterra from 13,661 reviews.

Asana is the general tool that handles the consultant coordination side of an architecture project best. Tasks can depend on each other, so "issue CD set" waits on "receive structural drawings", and the timeline view shows the knock-on effect when the engineer slips a week. Sections inside a project map cleanly onto phases, and portfolios roll several projects up for a principal who wants one status view. Time tracking exists but sits on the Advanced tier, which is where the price doubles.

Where Asana fits

  • Dependencies: Chain consultant deliverables to your own milestones and see slippage on the timeline.
  • Phases as sections: One project per commission, sections per phase, milestones at each approval gate.
  • Portfolios: Roll up every live project for a firm-wide view.
  • Forms: Capture client change requests in a structured way instead of by email.
  • Rules: Move tasks and notify people automatically when a phase is marked complete.

Where Asana isn't the right fit: Studios that want hours tracked against phases on the cheaper plan, and very small teams for whom the depth is overhead. There is no fee tracking of any kind.

What users say about Asana

Capterra reviewers rate Asana highly for the range of views, the ease of setting and tracking deadlines, and collaboration through comments and mentions. The most frequent complaints are notification overload that clutters inboxes, the number of useful features held back to higher tiers, including time tracking, occasional slowness, and a learning curve once you move past basic lists into automations and custom workflows.

Source: Capterra

monday.com

monday.com board with project phases and status columns

  • Pricing: Free for up to 2 seats and 3 boards. Basic is $9 per seat per month, Standard $12 and Pro $19, all billed annually. Paid plans start at a 3-seat minimum and are sold in seat bundles, so a team of four pays for five. Enterprise is quote-based. Checked September 2026 on monday.com's pricing page and support centre.
  • Rating: 4.6/5 on Capterra from 6,100 reviews.

monday.com suits studios where a principal or office manager wants to look at a dashboard and know the state of every project without opening any of them. Boards are flexible enough to model phases as groups, and the status columns and colour coding make progress obvious to a client on a screen share. The seat bundling is the thing to check before you commit: a studio of six needs a ten-seat plan.

Where monday.com fits

  • Dashboards: Combine several project boards into one view for the principal or the client.
  • Visual status: Colour-coded columns that a non-user can read at a glance.
  • Automations: Notify the consultant when a phase moves, or create the next phase's tasks when one closes.
  • Timeline and Gantt: Available from the Standard tier for phase scheduling.
  • Guest access: Clients and consultants can be invited to specific boards on paid plans.

Where monday.com isn't the right fit: Small studios paying for empty seats, and anyone who needs fee tracking. It is also easy to over-build; every studio that adopts it needs one person who owns the boards.

What users say about monday.com

Capterra and G2 reviewers praise the visual interface, drag-and-drop setup, customisable dashboards and the automations that keep work moving without manual updates, and most report good customer support. The criticisms cluster around pricing: the 3-seat minimum, seat bundles and features that unlock only on higher tiers. Reviewers also mention slow page loads on large boards, occasional bugs, and a learning curve for automation setup that the simple first impression does not prepare you for.

Sources: Capterra, G2

ClickUp

ClickUp workspace with list and board views

  • Pricing: Free Forever plan with 60 MB of storage. Unlimited is $7 per user per month billed annually or $10 monthly. Business is $12 annually or $19 monthly. Enterprise is quote-based. Checked September 2026 on ClickUp's pricing page.
  • Rating: 4.6/5 on Capterra from 4,622 reviews.

ClickUp is the most configurable general tool here and the one most likely to become a project of its own. A studio can model spaces per client, folders per project, lists per phase, and switch between list, board, Gantt, calendar and workload views on the same data. Native time tracking is included on every plan, which is unusual at this price. The trade-off is that someone has to design the structure and keep it tidy, and reviewers are clear that the interface takes time to learn.

Where ClickUp fits

  • Hierarchy: Client, project, phase and task nest naturally in spaces, folders and lists.
  • Time tracking on every plan: Log hours against phase tasks without an add-on.
  • Many views: Gantt for the schedule, board for the week, workload for staffing.
  • Docs alongside tasks: Keep meeting minutes and design notes next to the phase they belong to.
  • Generous free plan: Enough for a two-person practice to try the structure properly.

Where ClickUp isn't the right fit: Studios without someone willing to own the configuration, and anyone who wants the tool to be quick. Fee tracking is not there.

What users say about ClickUp

Capterra and G2 reviewers like having tasks, docs, goals and communication in one workspace and repeatedly cite the flexibility of the views. The strongest and most frequent complaint is performance: reviewers describe lag, freezing and slow loads, and say the mobile app crashes and lags behind the desktop version. The learning curve is the second most cited issue, with the sheer number of features described as overwhelming for new users.

Sources: Capterra, G2

Smartsheet

Smartsheet grid with Gantt chart for a project schedule

  • Pricing: No free plan. Pro is $9 per member per month billed annually for 1 to 10 members. Business is $19 per member per month billed annually for 3 or more members. Enterprise and Advanced Work Management are quote-based. 30-day free trial with no card. Checked September 2026 on Smartsheet's pricing page.
  • Rating: 4.5/5 on Capterra from 3,543 reviews.

Smartsheet is for the studio whose project schedule and fee table already live in Excel and whose principal does not want to give that up. Each sheet is a grid with dates, dependencies and a Gantt view attached, and formulas can hold a fee per phase next to hours logged, which is the closest a general tool in this list gets to fee-by-phase tracking. You are building it yourself, though, and every project needs the same care a spreadsheet does.

Where Smartsheet fits

  • Spreadsheet model: Rows, columns and formulas that a principal already knows how to read.
  • Gantt and dependencies: Phase schedules with predecessor logic and a critical path.
  • Fee columns: Put planned fee, logged hours and percent complete side by side per phase, by formula.
  • Forms and alerts: Collect consultant updates by form and remind people automatically.
  • Reports across sheets: Roll every project's phases into one firm-wide report.

Where Smartsheet isn't the right fit: Design-led studios that think in boards rather than rows, teams under three who cannot use the Business tier, and anyone expecting native time tracking or invoicing.

What users say about Smartsheet

Capterra and G2 reviewers value the familiar spreadsheet layout combined with Gantt charts, real-time collaboration and automated alerts and update requests that cut manual chasing. The recurring negatives are cost, especially for smaller teams and for capabilities such as resource management that sit in higher plans or paid add-ons, a steeper learning curve than the spreadsheet look suggests, lag on large sheets, and cross-sheet formulas that reviewers describe as tedious.

Sources: Capterra, G2

Wrike

Wrike project view with tasks and Gantt timeline

  • Pricing: Free plan for basic task management. Team is $10 per user per month billed annually for 2 to 15 users. Business is $25 per user per month billed annually for 5 to 200 users. Pinnacle and Apex are quote-based. 14-day free trial. Checked September 2026 on Wrike's pricing page.
  • Rating: 4.4/5 on Capterra from 3,038 reviews.

Wrike belongs in a studio of twenty or more with a project manager whose job includes maintaining the system. It has the deepest Gantt and workload tools of the general options, custom request forms that suit change requests from clients, proofing and approval flows for drawings issued as PDFs, and time tracking from the Business tier upward. Under fifteen people the configuration rarely pays back, and reviewers are unusually consistent that it is hard to onboard.

Where Wrike fits

  • Gantt depth: Interactive schedules with dependencies and critical path across projects.
  • Workload planning: See who is over-allocated across concurrent phases.
  • Request forms: Structured intake for client changes and consultant queries.
  • Proofing: Mark up PDFs and route approvals inside the tool.
  • Dashboards: Role-based views for principals, project architects and clients.

Where Wrike isn't the right fit: Small studios, anyone without a dedicated administrator, and firms whose main pain is fees rather than schedule. The 5-seat floor on Business sets a real minimum spend.

What users say about Wrike

Capterra and G2 reviewers praise the way Wrike centralises tasks, files and conversations, the real-time dashboards and Gantt charts, and the ability to build custom workflows and automation. The strongest complaints are price, with essential features held on Business and above and add-ons raising the real cost, a steep learning curve and dense interface that reviewers say is not beginner friendly, notification overload, and clutter once projects have many nested tasks.

Sources: Capterra, G2

Trello

Trello board with lists used as project phases

  • Pricing: Free for up to 10 boards and 10 collaborators per workspace. Standard is $5 per user per month billed annually or $6 monthly. Premium is $10 annually or $12.50 monthly. Enterprise is $17.50 per user per month billed annually. Checked September 2026 on Trello's pricing page.
  • Rating: 4.5/5 on Capterra from 23,599 reviews.

Trello is one board per project with a list per phase, and for a two-to-eight person studio that is often all the software needed. Cards hold the drawing set, the consultant's email and the due date, and the whole team can read the board in seconds. It stops working at the point where you need to see across ten projects at once, or track hours, or chain tasks together, and the free plan's ten-board cap arrives quickly for a studio with a healthy pipeline.

Where Trello fits

  • Zero setup: A phase board exists in five minutes and needs no administrator.
  • Visual by default: Everyone, including a client on a call, reads it immediately.
  • Checklists: Deliverables per phase as a checklist on the phase card.
  • Cheap: The lowest paid price in this list.
  • Automation: Built-in rules for moving cards and setting dates.

Where Trello isn't the right fit: Studios past about ten people or ten concurrent projects, anyone needing time tracking or reporting, and work that depends on dependencies between tasks.

What users say about Trello

Capterra and G2 reviewers consistently praise the intuitive drag-and-drop boards, the low price and the free tier, and integrations with Slack and Google Drive. The recurring criticisms are that large projects get cluttered and hard to navigate, reporting is thin without third-party add-ons, dependencies and automation are limited, notifications are inconsistent, and permission controls on smaller plans are too coarse for sensitive information.

Sources: Capterra, G2

Notion

Notion workspace with a project database and notes

  • Pricing: Free plan for individuals, limited for workspaces with 2 or more members. Plus is $10 per member per month and Business is $20 per member per month, with yearly billing saving up to 20 percent. Enterprise is quote-based. Checked September 2026 on Notion's pricing page.
  • Rating: 4.7/5 on Capterra from 2,808 reviews.

Notion is a documents tool with databases attached, and that is how studios should use it: meeting minutes, client briefs, precedent libraries, code research and a project database that links them all. It can carry a task list per phase and show it as a board or timeline, but there is no time tracking, no workload view and no notion of fees. Studios that already keep their project notes in Notion often pair it with one of the lighter tools above for the actual task tracking.

Where Notion fits

  • Project wiki: Briefs, minutes, decisions and research in one linked structure per project.
  • Databases: Projects, phases, consultants and contacts as related tables.
  • Templates: A phase page template with the standard deliverables list already in it.
  • Client-facing pages: Share a project page publicly or with guests.
  • Light task tracking: Enough for a small studio's weekly list.

Where Notion isn't the right fit: As the primary project management tool for a studio of any size. It has no hours, no fees and no reporting, and large databases slow down.

What users say about Notion

Capterra and G2 reviewers love the flexibility and the consolidation of notes, documents, databases and tasks in one customisable workspace, and rate the interface as clean and modern. The consistent complaints are slowness with large databases and complex pages, a learning curve that comes with the customisation, a mobile app that lags the desktop version, unreliable offline access, and reporting and formula features that fall short of dedicated project management software.

Sources: Capterra, G2

How to choose between these tools

Start with what hurts. Studios that cannot answer "how much of the DD fee is left" have a fee tracking problem, and only two tools here solve it. Studios that miss consultant deadlines or lose track of what is due this week have a coordination problem, and most of the general tools solve that for less.

  • Monograph: when you invoice by phase, fees are mostly fixed, and you want planned, logged and invoiced on one timeline.
  • BQE CORE: when you want time, billing, accounting and CRM under one login and can absorb the setup period.
  • Deltek Ajera or Vantagepoint: when you are a larger AEC firm with multi-office resource planning and payroll needs. Both are quote-based and outside the scope of this list.
  • Breeze: when you want phase boards, time tracking and free client and consultant access without an administrator, and fees stay in your accounting software.
  • Asana: when consultant dependencies and slippage are the main problem and you are willing to pay the Advanced tier for time tracking.
  • monday.com: when a principal or client wants dashboards and colour-coded status above all, and the seat bundles fit your headcount.
  • Smartsheet: when your schedule and fee table already live in a spreadsheet and you want to keep that model with Gantt and alerts added.
  • Wrike: when the studio is twenty people or more and someone will own the configuration.
  • Trello: when you are under ten people, one board per project is enough, and hours are tracked elsewhere.
  • Notion: for project documentation alongside one of the above, not instead of it.

Studios that also take on branding, interiors or exhibition work will find the trade-offs slightly different, and the comparison of tools for creative studios covers that side. Firms doing design-build should read the construction project management page as well, since the site side raises requirements none of these ten fully meet.

FAQ

Do architects need a Gantt chart to manage projects?
Not always. A studio running a handful of projects usually needs phase dates, a list of what is due this week and a place for consultant follow-ups more than a full dependency chart. A Gantt view earns its place once you are staffing several overlapping projects and need to see where design development on one job collides with construction documents on another.
Can a small architecture studio run projects in Trello or Notion?
Yes, for the coordination part. A board per project with one list per phase works well up to about ten people. What Trello and Notion cannot do is track fees against hours by phase, so you will still need spreadsheets or accounting software for the money side, and the two will drift apart unless someone reconciles them every week.
Which of these tools handle RFIs, submittals and drawing revisions?
None of the ten in this list are built for that. Monograph and BQE CORE track phases, time and fees, not construction administration logs. General tools can hold an RFI as a task with a due date and an attachment, which is enough for a small residential or commercial job, but a firm with dozens of open RFIs on a large project should look at a dedicated construction administration tool alongside whatever it uses for planning.
Is Monograph worth it for a five-person studio?
It depends on whether you invoice by phase. If most of your fees are fixed per phase and you want to see planned, logged and invoiced amounts on one timeline, Monograph replaces a spreadsheet you are probably maintaining by hand. If you bill hourly and mostly need task tracking and time logs, a general tool at a third of the price covers it.

Takeaway

The honest split for architects: Monograph and BQE CORE are the only tools here that understand a fee per phase, and they are worth their price when that is the problem. Everything else tracks the work, not the money. Among the general tools, Breeze and Trello are the quickest to run for a small studio, Asana is the strongest for consultant dependencies, monday.com for dashboards, Smartsheet for spreadsheet-minded firms and Wrike for larger studios with someone to run it. Whatever you choose, set up one project with all four phases and a real consultant before you decide, because the tool that looks best in a demo is rarely the one the whole studio will still be using in six months.


Keep every phase, consultant and deadline in one place